BIM coordination is most valuable before site execution, when a clash can still be resolved through information instead of demolition, delay or improvised installation.

Find more than geometric clashes

A federated model brings architecture, structure and building services into one review environment. The team can identify intersections, but also missing access, inadequate clearances, impossible drainage falls and service routes that conflict with ceilings or equipment replacement.

Priority should go to plant rooms, risers, corridors, typical toilets and other zones where multiple systems compete for limited space.

  • Hard clashes between physical elements
  • Soft clashes involving access, insulation and maintenance
  • Sequence, tolerance and builders' work conflicts

Create one accountable issue trail

Every coordination issue needs a clear location, description, owner, due date and closure evidence. Meetings alone do not provide a reliable record for later drawing release.

A controlled issue workflow helps teams distinguish design decisions from modelling tasks and ensures that resolved information reaches coordinated drawings used on site.

  • Agreed model standards and coordination zones
  • Named issue owners with dates and status
  • Model and drawing revisions released together

Give contractors buildable information

Coordination should improve installation, not merely produce a visually complete model. Routes must allow supports, joints, insulation, valves, testing points and practical trade sequence.

When the coordinated model, drawings and builders' work information agree, procurement and prefabrication decisions can be made with greater confidence.

  • Installable routes and workable trade sequence
  • Clear sleeves, openings, bases and support zones
  • More reliable quantities, prefabrication and site planning

PROJECT CHECKLIST

Questions to take into the next meeting

  1. Is there a BIM execution and responsibility plan?
  2. Are model coordinates, levels and naming agreed?
  3. Have plant rooms, risers and typical zones been prioritised?
  4. Are access, insulation and installation tolerances checked?
  5. Does every issue have an owner and closure evidence?
  6. Do released drawings match the coordinated model?